Monday, September 17, 2018

Winterizing(ish)


It is still September but with Nauti Dog out the water there is plenty of time to catch-up on all the tasks that seem to be always be pushed off. 

Task 1: Dropping off the mainsail at the sail loft for cleaning and tending. And the dog came along for the ride to supervise.

Sunday, June 10, 2018

Unfortunately Nauti Dog will not be launching during 2018. But this give us plenty of time to prep for a May 2019 launch! Throughout year we will keep everyone updated.

Monday, May 28, 2018

Memorial Day


On this day and every day we are grateful beyond expression for the brave for men and woman our Armed Services who gave their lives to give us FREEDOM! Our thoughts and prayers are always with families and friends of these great heroes.

Saturday, May 26, 2018

Figawi Weekend is here! Unfortunately we are not participating this year but do wish a great race for everyone!


Saturday, November 11, 2017

To every Veteran 
THANK YOU 
for your service & 
dedication to our great nation!


Monday, September 18, 2017

Storm Preparation

Hurricane Jose is moving North but is expected to weaken to a Tropical Storm before having any impact on our coast. Even though sustained winds will be moderate, gusts could be as high as 50 kts. With the forecast I decided to prep Nauti Dog in case  Jose swung West.

Motoring the dinghy out I was greeted by a flock of bird on the deck, boom, rails and the brand new Lifesling. Other boats nearby were hosting flocks of birds too. I have never seen this many birds in the mooring field before. No idea if the storm pushed the birds up along the coast???


Other boats were preparing for Jose too. Before any prep started I cleaned the deck, sail cover,etc. Afterwards  I started with the following: Charged the batteries, tied safety knot on mooring cleat, secure mooring pennant float, removed and stow spinnaker pole below deck, de-sailed, secured halyards to the outer most points, secured & bundled lines to large winches, ops-checked bilge pump, secured/removed any loose gear below deck (brushes, grill, bucket). Then when I was ashore removed outboard from dinghy. Total prep time was less than 2 hours and most of that time was cleaning.

Tuesday, September 5, 2017

Lifesling2 "Installed"



It took me longer to remove the old horseshoe buoy mount than “installing” the new Lifesling2. All I had to do was hang the Lifesling2 on the stern rail and secure the flap with velco on the vertical and horizontal rail section. Then tied the retrieval line to the stern rail base. One key note from the manual is to “mount the bag inside of the stern railing or pulpit”. I have seen several creative mounting location and methods on various boats. Next is practice! Then we can decide if the Lifesling Hoisting Tackle is necessary.